How it works
From a charging site to a charge record, step by step
Getz Network follows the same path for every charging session: the physical estate, the energy limits that apply to it, the session itself, the record it produces and the reports built from those records. Explore each step below.
The rollout
Assess, connect, agree, operate
Every rollout takes the same four steps, each with a clear owner.
Step 1: Assess your supply
With your electrical engineer or installer: the connection, building load, backup power, metering and what owners and finance need to see.
Step 2: Connect and test chargers
Your installer connects the chargers over OCPP, works through the commissioning checklist and runs a test session; the operator signs off before anything is published.
Step 3: Agree limits and prices
The site owner and operator agree the site limit, the backup-power limit, who may charge and the tariffs.
Step 4: Operate and report
The operator runs the chargers remotely; finance exports charge records, and owners and funders get read-only views of their sites.
Interactive architecture
The operating workflow
Select a step, or use Tab and the arrow keys, to see what Getz Network does at that point.
The operating workflow in Getz Network
From the physical estate to the reports: site, charging station, EVSE and connector, then energy management, the charging session, the charge record and reporting.
Site
The place you operate: an address and coordinates, its country (which sets VAT and currency), facilities and parking for apps, and whether it is public or private. Energy limits and the host portal are set per site.
Use Tab to reach the diagram, then the arrow keys to move between parts.
In detail
Under the hood: eight steps from site to report
Step 1: Site
Create the site with its address, coordinates and country. The country sets VAT and currency; visibility (public or private) is set here and inherited by everything below it.
Step 2: Charging station
The charger connects over OCPP 1.6J or 2.0.1 with its own password. Its model, serial, firmware and SIM go into the hardware registry, and it waits for commissioning sign-off.
Step 3: EVSE
An EVSE is the part of a charger that charges one car at a time. Its status is tracked and published to Getz Hub once commissioned, with any bookable-bay rules.
Step 4: Connector
Each connector has its plug type, power and assigned tariff. Connectors with an unknown plug type are never published.
Step 5: Energy management
The site’s EV budget is the lowest of its limit, time-of-use band and grid headroom, or its backup-power limit during an outage, recalculated at least every 5 minutes.
Step 6: Charging session
A session starts from a card, a driver’s app through Getz Hub or a remote command. Charging profiles keep it within the budget; it ends when the charger reports the stop.
Step 7: Charge record
Exactly one immutable record per completed session, priced with the connector’s tariff and the site’s VAT, and published to Getz Hub for roamed sessions.
Step 8: Reporting
Two outputs: operator finance records (scheduled CSV, Xero, QuickBooks and Sage files, with amounts) and read-only host and funder views (usage and availability, no prices).
Interactive: an outage, step by step
A morning of ZESA load-shedding at one site
Step through a planned outage at a fictional site with a 30 kW backup-power limit. The chart shows the EV charging budget through the morning.
Grid supply, a normal morning
The EV budget follows grid headroom: 120 kW is available after the building load, about 20 kW for each of the six cars charging.
Interactive: from session to statement
Follow one session to the reports
Select each stage to see what happens to a fictional session’s record, from the charger to your accounting files and the owner’s portal.
The charger reports the session’s end
Meter values arrive over OCPP while the car charges. When the transaction stops, the session closes. Late messages never reopen it; late meter data is kept as flagged evidence.
| Site | Demo Centre – Borrowdale |
|---|---|
| Connector | Borrowdale DC 1 · CCS2 |
| Energy | 18.4 kWh |
| Charging time | 41 min |
Where it fits
Between your chargers and the apps drivers use
Getz Network talks to chargers over OCPP and to roaming partners only through Getz Hub over OCPI. It never sets the price a driver pays in someone else’s app.
Where Getz Network sits
Chargers talk to Getz Network over OCPP. Network reaches driver apps only through Getz Hub, over OCPI.
Getz Network (the back office)
Runs your sites: charger operations, energy limits, tariffs and VAT, and the records your finance team and funders rely on.
Use Tab to reach the diagram, then the arrow keys to move between parts.
Walk through it with your own sites
A demonstration follows these steps in the real back office with demonstration data.