Mining and industrial operations
Private charging for remote, power-critical sites
On a gold mine near Kwekwe, a platinum operation on the Great Dyke or a plant in an industrial park, charging must never compete with production, power is often generated on site, and the people on site work for many contractors. Getz Network keeps charging private and within strict limits, and records who did what.
Charger and connector management: every charger with its live connectivity and connector status.
- What you see: status from each charger’s OCPP messages
- Why it matters: filter to what is offline or faulted and act
The problem
Industrial sites have their own rules
Electrification of light vehicles and site transport is easier when charging is just another controlled load.
Production comes first
Processing plant and ventilation have absolute priority over vehicle charging.
Generated and backup power
Gensets and hybrid plants have firm limits and changing availability.
Remote and secure
Sites are far from towns, connectivity is cellular or private, and nothing should be public.
Many contractors
Electrical and maintenance work is done by several contractors who need narrow access.
A contractor on site
Every charger traceable to its identity, firmware and history
Each charger’s record holds its OCPP identity, model, firmware, connectors and recent activity. Contractors get roles scoped to the work they do, and every change they make stays in the audit trail.
- Narrow installer and maintenance roles with audited tools
One charger in depth: identity, hardware model, firmware, connectors and remote actions.
- What you see: the model and firmware the charger reported at boot
- Why it matters: remote actions without a site visit
How Getz Network helps
What Getz Network provides
Private by default
Sites stay private: never on public maps, never in partners’ apps.
Firm EV limits
A site limit that caps charging regardless of headroom, plus time-of-use bands.
Generator and outage limits
A backup-power limit during outages on record.
Narrow roles for contractors
Maintenance and installer roles that cannot see prices or customers, scoped to one site if needed.
Work orders with SLAs
Alerts open work orders for the right contractor, with SLAs and checklists.
A full audit trail
Every back-office change and every OCPP message is kept as evidence.
Getting started
How an industrial rollout starts
Step 1: Engineering review
Agree how charging fits the site’s power hierarchy with your electrical engineers.
Step 2: Access and roles
Define which teams and contractors may do what, and on which sites.
Step 3: Connectivity check
Confirm how chargers will reach the back office from site.
Step 4: Go live on one site
Set limits, roles and alerts on the first site, then extend.
Questions
Mining and industrial operations: questions
What happens if the site loses its data connection?
Chargers need a connection to the back office for energy control and live status. While it is down, each charger follows its own model and configuration, which is checked at commissioning. Connectivity is part of the site assessment, and edge controllers that keep a site authorising and charging offline are coming soon.
Where is our data held?
Where your data is held, and for how long, is confirmed per customer in your agreement; see Security.
Talk to us about your site
We will start with your engineers and your power hierarchy.