Energy and load management
Chargers get only the spare power after your building’s load
Your building comes first. Getz Network sets an EV charging budget for each site from the limits that matter: what you allow, what the tariff band allows, and what the grid connection has left after the building’s measured load. During an outage on record, the backup-power limit takes over.
A 70 kW site limit, shared live between the cars charging now.
- What you see: the site limit, what is allocated and why each EVSE gets its share
- Why it matters: EV charging stays inside the site limit you set
What it does
How the energy controls work
The lowest limit wins
The EV budget is the lowest of the site limit you configure, the time-of-use band’s cap and the grid limit minus the building’s measured load.
Backup-power limit during outages
Each site can carry a continuity policy. During a planned outage on record, charging is capped at its backup-power limit.
Recalculated continuously
On every session start and stop, on new meter readings and at least every 5 minutes, so the budget follows the building through the day.
Profiles sent to the chargers
OCPP charging profiles per session or per charger, with a deadband to avoid constant small changes. Every send is logged.
Utility tariffs priced in
Attach your ZERA-approved ZETDC tariff to a site: the budget is costed by the rate in force, and a time-of-use window with an EV cap becomes a band.
A site meter you designate
Building load comes from a meter that reports over OCPP, named for the site. Without a meter, the site limit and bands still apply as fixed limits.
Load-shedding schedule import
Published schedules flow straight into each site’s outage calendar.
Coming soon
Solar forecast and power timeline
Plan charging around the day’s solar production on one power timeline.
Coming soon
In the product
Energy limits per site, in the back office
Each site’s load group holds its limit, its time-of-use bands and the meter that measures the building. Planned outages and the continuity policy sit next to it, so operations and energy teams see the same picture.
The load-control loop, live: budget, allocation per session and the limits sent to chargers.
- What you see: EV budget, load now and each session’s allocated power
- Why it matters: every limit sent to a charger is logged and acknowledged
Interactive: grid capacity
See how the EV budget is set
Move the sliders to change the grid connection, the building’s load, your EV site limit and the time-of-use band. The chargers get the lowest of the three limits, shared across the cars that are charging.
EV charging budget90 kWSet by: Grid headroom
6 cars want up to 132 kW together. Each gets about 15 kW while the limit applies.
Questions
Energy and load management: questions
Do we need a site meter, and who sets it up?
For grid-headroom control, yes: Getz Network needs a meter that reports the building’s load over OCPP. Which meter or gateway can do that on your site, and who installs and configures it (usually your installer or electrical contractor), is confirmed during the site assessment. Without one, charging still stays within the site limit you configure and any time-of-use bands, which then act as fixed limits.
What if the meter stops reporting or a charger does not take a limit?
If the site meter stops reporting, charging falls back to the site limit and time-of-use bands, which apply with or without it. Every charging profile sent to a charger is logged with the charger’s response, so a rejected or unanswered limit is visible to your operators, and an alert can open a work order. Which profile types each charger model accepts is checked at commissioning.
How are the energy limits set up for a site?
During onboarding we agree the site limit, the time-of-use bands, the site meter and the backup-power limit with you and your installer, then rehearse an outage with the limits in place before the site goes live.
Find out how much headroom your site has
A site assessment looks at your connection, building load, backup system and charger plans.