A shopping centre’s supply exists for its tenants: anchor stores, cold rooms, lifts and lighting. Whether the centre is in Borrowdale, Avondale or Bulawayo, Getz Network lets you add EV charging for shoppers without competing with that load, keeps chargers within the backup system during ZESA load-shedding, and gives property management the numbers they ask for.

The load-control loop, live: budget, allocation per session and the limits sent to chargers.

  1. What you see: EV budget, load now and each session’s allocated power
  2. Why it matters: every limit sent to a charger is logged and acknowledged

The problem

What centre managers tell us worries them

Charging bays are a footfall and dwell-time story, but only if they never become an electrical or tenant problem.

  1. The centre’s electricity limit

    Trading-hour peaks already push the bulk supply. A row of DC chargers at lunchtime on a Saturday is the last thing the electrical engineer wants.

  2. Tenant relationships

    Tenants on recovered electricity costs and anchor tenants with lease clauses about supply need to know EV charging never takes priority over them.

  3. Backup-power capacity

    Generators and inverters are sized for essential load during ZESA load-shedding. Chargers left running could take that capacity.

  4. Utilisation you can show

    Leasing and asset managers ask whether the bays are used, when, and whether they justify more.

A Saturday at the centre

Peak trading, every bay taken, the centre still comes first

At lunchtime on a busy Saturday the centre’s own load is at its highest. Getz Network gives the parking area only the headroom left after the centre, shares it across the cars charging and recalculates as shoppers come and go.

The site page shows management and the operator the same picture: chargers online, bays free and sessions in progress.

  • Smart charging within grid headroom

A site at a glance: connectivity, EVSE status, live sessions and pricing coverage.

  1. What you see: chargers online, EVSEs charging, connectors priced
  2. Why it matters: a site is ready to publish only when every connector has a price

How Getz Network helps

How Getz Network handles it

  • Charging below the centre’s peak

    EV charging gets the headroom left after the centre’s measured load, and never more than the limit you set for the parking area.

  • A backup-power limit for outages

    During a planned outage, chargers share the backup-power limit you agree with your engineer, instead of competing with essential load.

  • Peak-tariff bands

    A time-of-use window can cap EV charging when the centre’s own electricity is most expensive.

  • A portal for property management

    Give the property or asset manager read-only access to the site’s sessions, availability and energy, without prices.

  • Shoppers’ apps

    Publish the bays to participating driver apps through Getz Hub, with the mall listed as a facility so drivers can find it.

  • Bookable bays

    Offer bookable bays with a booking fee and a no-show fee, so a reserved bay is not left empty.

Interactive: grid capacity

See how the EV budget is set

Move the sliders to change the grid connection, the building’s load, your EV site limit and the time-of-use band. The chargers get the lowest of the three limits, shared across the cars that are charging.

Illustration · synthetic values

EV charging budget90 kWSet by: Grid headroom

6 cars want up to 132 kW together. Each gets about 15 kW while the limit applies.

Getting started

How we would start with a centre

  1. Step 1: What the assessment checks

    Supply headroom at peak trading, the loads that must stay protected (anchor tenants, cold rooms, lifts), the metering available, the backup system, and whether an upgrade would still be needed for the bays you want.

  2. Step 2: Bay plan and limits

    Agree how many bays, the EV site limit, any peak-hour caps and the backup-power limit.

  3. Step 3: Go live on one parking area

    Commission the chargers, set the energy controls on your supply and agree what management wants reported.

  4. Step 4: Report and decide

    Use the portal and exports to decide with the owner whether to add bays.

Questions

Shopping centres and malls: questions

Can charging ever take power a tenant needs?

Getz Network limits EV charging to the headroom left after the centre’s measured load and to the site limit you set, recalculated at least every 5 minutes. This depends on a site meter that reports the centre’s load, which we confirm during the assessment.

Who sets the tenant priority and the outage limit, and who pays if headroom is short?

The centre does, with its electrical engineer: you decide the EV limit for the parking area and the backup-power limit, and Getz Network enforces them and logs every limit sent to a charger with its acknowledgement. If the headroom is not enough for the bays you want, the assessment says so; whether to fund an upgrade remains the owner’s decision.

Can the owner see revenue from the bays?

The owner’s portal shows operations and energy, not prices. Revenue reporting comes from the operator’s charge records and accounting exports, which you can share with the owner.

Plan charging for your centre

Start with a site assessment of your supply, backup system and parking.