Skip to main content
Getz Network

How it works

From a charging site to a charge record, step by step

Getz Network follows the same path for every charging session: the physical estate, the energy limits that apply to it, the session itself, the record it produces and the reports built from those records. Explore each step below.

The rollout

Assess, connect, agree, operate

Every rollout takes the same four steps, each with a clear owner.

  1. Step 1: Assess your supply

    With your electrical engineer or installer: the connection, building load, backup power, metering and what owners and finance need to see.

  2. Step 2: Connect and test chargers

    Your installer connects the chargers over OCPP, works through the commissioning checklist and runs a test session; the operator signs off before anything is published.

  3. Step 3: Agree limits and prices

    The site owner and operator agree the site limit, the backup-power limit, who may charge and the tariffs.

  4. Step 4: Operate and report

    The operator runs the chargers remotely; finance exports charge records, and owners and funders get read-only views of their sites.

Interactive architecture

The operating workflow

Select a step, or use Tab and the arrow keys, to see what Getz Network does at that point.

Illustration

The operating workflow in Getz Network

From the physical estate to the reports: site, charging station, EVSE and connector, then energy management, the charging session, the charge record and reporting.

1 · Site2 · Charging station3 · EVSE4 · Connector5 · Energy management6 · Charging session7 · Charge record8 · Reporting

Site

The place you operate: an address and coordinates, its country (which sets VAT and currency), facilities and parking for apps, and whether it is public or private. Energy limits and the host portal are set per site.

Use Tab to reach the diagram, then the arrow keys to move between parts.

In detail

Under the hood: eight steps from site to report

  1. Step 1: Site

    Create the site with its address, coordinates and country. The country sets VAT and currency; visibility (public or private) is set here and inherited by everything below it.

  2. Step 2: Charging station

    The charger connects over OCPP 1.6J or 2.0.1 with its own password. Its model, serial, firmware and SIM go into the hardware registry, and it waits for commissioning sign-off.

  3. Step 3: EVSE

    An EVSE is the part of a charger that charges one car at a time. Its status is tracked and published to Getz Hub once commissioned, with any bookable-bay rules.

  4. Step 4: Connector

    Each connector has its plug type, power and assigned tariff. Connectors with an unknown plug type are never published.

  5. Step 5: Energy management

    The site’s EV budget is the lowest of its limit, time-of-use band and grid headroom, or its backup-power limit during an outage, recalculated at least every 5 minutes.

  6. Step 6: Charging session

    A session starts from a card, a driver’s app through Getz Hub or a remote command. Charging profiles keep it within the budget; it ends when the charger reports the stop.

  7. Step 7: Charge record

    Exactly one immutable record per completed session, priced with the connector’s tariff and the site’s VAT, and published to Getz Hub for roamed sessions.

  8. Step 8: Reporting

    Two outputs: operator finance records (scheduled CSV, Xero, QuickBooks and Sage files, with amounts) and read-only host and funder views (usage and availability, no prices).

Interactive: an outage, step by step

A morning of Eskom load-shedding at one site

Step through a planned outage at a fictional site with a 30 kW backup-power limit. The chart shows the EV charging budget through the morning.

Illustration · synthetic values
Outage window0 kW30 kW60 kW90 kW120 kWBackup-power limit 30 kW07:0009:3010:0011:0012:3013:00

On grid supply07:00 · budget 120 kW · 6 sessions · ≈20 kW each

Grid supply, a normal morning

The EV budget follows grid headroom: 120 kW is available after the building load, about 20 kW for each of the six cars charging.

Interactive: from session to statement

Follow one session to the reports

Select each stage to see what happens to a fictional session’s record, from the charger to your accounting files and the owner’s portal.

Illustration · synthetic values

The charger reports the session’s end

Meter values arrive over OCPP while the car charges. When the transaction stops, the session closes. Late messages never reopen it; late meter data is kept as flagged evidence.

Synthetic record facts at this stage
SiteDemo Mall – Rosebank
ConnectorRosebank DC 1 · CCS2
Energy18.4 kWh
Charging time41 min

Where it fits

Between your chargers and the apps drivers use

Getz Network talks to chargers over OCPP and to roaming partners only through Getz Hub over OCPI. It never sets the price a driver pays in someone else’s app.

Illustration

Where Getz Network sits

Chargers talk to Getz Network over OCPP. Network reaches driver apps only through Getz Hub, over OCPI.

ChargersGetz NetworkSite powerGetz HubDriver apps

Getz Network (the back office)

Runs your sites: charger operations, energy limits, tariffs and VAT, and the records your finance team and funders rely on.

Use Tab to reach the diagram, then the arrow keys to move between parts.

Walk through it with your own sites

A demonstration follows these steps in the real back office with demonstration data.