Skip to main content
Getz Network

Commissioning and configuration

Commission once, keep every charger as intended

A charger should not appear on a driver’s map until it has been installed, tested and signed off. Getz Network holds new chargers back until commissioning is complete, then keeps their firmware and settings where you want them.

The commissioning gate: a charger is published only after its checklist is signed off.

  1. What you see: automatic and manual steps before sign-off
  2. Why it matters: nothing goes public half-installed

What it does

From first boot to steady state

  • Commissioning gate

    New hardware starts pending. The installer checklist moves it to in progress, sign-off commissions it and publishes it. A test session is verified from a real completed session.

  • Signed firmware campaigns

    Target by model, site, tag or charger; skip incompatible models; canary first, then waves inside maintenance windows, never during a session.

  • Automatic pause

    A campaign pauses itself when failures pass the threshold you set, and rollbacks are reported.

  • Configuration profiles

    Profiles per charger model are pushed over OCPP and every change is trailed.

  • Drift detection and repair

    Settings are read back periodically. Drift is flagged and, if you allow it, repaired automatically.

  • Installer tools

    An installer role that can read and change writable settings, set network profiles and power limits, all in an append-only trail.

In the product

Firmware campaigns you can stop

Each campaign shows its waves, which chargers updated, which failed and why. A second operator can be required to approve it before it starts.

Signed firmware rolled out in waves, approved by a second operator.

  1. What you see: waves, approvals and per-charger results
  2. Why it matters: no unsigned or unapproved firmware reaches a charger

Questions

Commissioning and configuration: questions

Which charger models are supported?

Any charger that speaks OCPP 1.6J or 2.0.1 can connect. Which remote commands, firmware updates, smart-charging profiles and offline behaviour work depends on the model and firmware, so each model is checked at commissioning. A charger’s model is recorded from its boot message, and each model gets its own configuration profile and firmware targeting. Tell us your models in a site assessment request and we will say what has to be tested.

What does a property manager agree at handover?

Typically: who may use the bays and whether they are public, the site and backup-power limits, the prices, and who to call when a charger stops. The charger is published only after its commissioning checklist is signed off, and every sign-off and configuration change stays in the audit trail.

What about chargers that were installed before Getz Network?

Chargers already in service when tracking starts are marked as legacy, so they keep working while you bring them under the commissioning process at your own pace.

Installing chargers for your customers?

Discuss an installer partnership and commission sites with Getz Network from day one.