Charging infrastructure management
Know every charger you run, down to the connector
Getz Network models your estate the way OCPI does: site, charging station, EVSE (the part of a charger that charges one vehicle at a time) and connector. Every charger reports in over OCPP, so you see the last status, firmware and pricing coverage each charger reported, with its last-seen time.
A site at a glance: connectivity, EVSE status, live sessions and pricing coverage.
- What you see: chargers online, EVSEs charging, connectors priced
- Why it matters: a site is ready to publish only when every connector has a price
What it does
What you manage in one place
One estate model
Site, charging station, EVSE and connector, the same structure the roaming protocols use, so what you configure is what partners see.
Chargers on OCPP 1.6J and 2.0.1
Chargers connect with their own OCPP password. Vendor, model, serial, firmware and SIM are read from the charger’s boot message into a hardware registry.
Live connector status
Available, charging, faulted or offline, per connector, from the charger’s own status messages, with last-seen times for cellular sites.
Publication you control
Choose which sites stay private, such as tenant or staff bays, and which drivers can find in apps. Private sites never reach public maps; public ones are published with facilities and parking details.
Pricing coverage before go-live
See which connectors have a tariff before a site goes public, and assign tariffs by connector, EVSE, station, site or operator.
Commissioning gate
A charger is held back from partners until its commissioning checklist is signed off, so half-installed chargers never appear on a map.
In the product
From a new site to a published charger
Create the site with its address, country and visibility. When a charger boots for the first time it registers itself with its model and firmware and waits in commissioning. Your installer completes the checklist, a test session confirms it charges, and only then are its EVSEs published to Getz Hub.
- Hardware registry filled from the charger’s boot message
- EVSEs with unknown plug types are never published
Charger and connector management: every charger with its live connectivity and connector status.
- What you see: status from each charger’s OCPP messages
- Why it matters: filter to what is offline or faulted and act
Questions
Charging infrastructure management: questions
Why model sites, stations, EVSEs and connectors separately?
Because drivers’ apps, tariffs and status all work at different levels. A tariff may apply to one connector, availability is per EVSE, and visibility is per site. Using the same structure as OCPI means what you see in Getz Network is exactly what roaming partners receive.
Our chargers are on cellular. Can we tell which SIM is in which charger?
Yes. When a charger reports its SIM’s ICCID in its boot message, it is recorded in the hardware registry next to the charger’s model, serial and firmware.
What can a site owner or funder see of this?
Not the back office. You can give them a read-only portal for the sites they are entitled to, with the operational and energy views you choose (such as availability, energy delivered and sessions per day) and no prices or token ids. See the host and investor portal.
Bring your estate into one model
Tell us how many sites and chargers you run today, and which charger models. We will map them with you.