Shopping centres and malls
EV charging that puts the centre’s tenants first
A shopping centre’s supply exists for its tenants: anchor stores, cold rooms, lifts and lighting. Whether the centre is in Sandton, Rosebank or Umhlanga, Getz Network lets you add EV charging for shoppers without competing with that load, keeps chargers within the backup system during Eskom load-shedding, and gives property management the numbers they ask for.
The load-control loop, live: budget, allocation per session and the limits sent to chargers.
- What you see: EV budget, load now and each session’s allocated power
- Why it matters: every limit sent to a charger is logged and acknowledged
The problem
What centre managers tell us worries them
Charging bays are a footfall and dwell-time story, but only if they never become an electrical or tenant problem.
The centre’s electricity limit
Trading-hour peaks already push the bulk supply. A row of DC chargers at lunchtime on a Saturday is the last thing the electrical engineer wants.
Tenant relationships
Tenants on recovered electricity costs and anchor tenants with lease clauses about supply need to know EV charging never takes priority over them.
Backup-power capacity
Generators and inverters are sized for essential load during Eskom or municipal load-shedding. Chargers left running could take that capacity.
Utilisation you can show
Leasing and asset managers ask whether the bays are used, when, and whether they justify more.
A Saturday at the centre
Peak trading, every bay taken, the centre still comes first
At lunchtime on a busy Saturday the centre’s own load is at its highest. Getz Network gives the parking area only the headroom left after the centre, shares it across the cars charging and recalculates as shoppers come and go.
The site page shows management and the operator the same picture: chargers online, bays free and sessions in progress.
- Smart charging within grid headroom
A site at a glance: connectivity, EVSE status, live sessions and pricing coverage.
- What you see: chargers online, EVSEs charging, connectors priced
- Why it matters: a site is ready to publish only when every connector has a price
How Getz Network helps
How Getz Network handles it
Charging below the centre’s peak
EV charging gets the headroom left after the centre’s measured load, and never more than the limit you set for the parking area.
A backup-power limit for outages
During a planned outage, chargers share the backup-power limit you agree with your engineer, instead of competing with essential load.
Peak-tariff bands
A time-of-use window can cap EV charging when the centre’s own electricity is most expensive.
A portal for property management
Give the property or asset manager read-only access to the site’s sessions, availability and energy, without prices.
Shoppers’ apps
Publish the bays to participating driver apps through Getz Hub, with the mall listed as a facility so drivers can find it.
Bookable bays
Offer bookable bays with a booking fee and a no-show fee, so a reserved bay is not left empty.
Interactive: grid capacity
See how the EV budget is set
Move the sliders to change the grid connection, the building’s load, your EV site limit and the time-of-use band. The chargers get the lowest of the three limits, shared across the cars that are charging.
EV charging budget100 kWSet by: Grid headroom
6 cars want up to 132 kW together. Each gets about 16.7 kW while the limit applies.
Getting started
How we would start with a centre
Step 1: What the assessment checks
Supply headroom at peak trading, the loads that must stay protected (anchor tenants, cold rooms, lifts), the metering available, the backup system, and whether an upgrade would still be needed for the bays you want.
Step 2: Bay plan and limits
Agree how many bays, the EV site limit, any peak-hour caps and the backup-power limit.
Step 3: Go live on one parking area
Commission the chargers, set the energy controls on your supply and agree what management wants reported.
Step 4: Report and decide
Use the portal and exports to decide with the owner whether to add bays.
Questions
Shopping centres and malls: questions
Can charging ever take power a tenant needs?
Getz Network limits EV charging to the headroom left after the centre’s measured load and to the site limit you set, recalculated at least every 5 minutes. This depends on a site meter that reports the centre’s load, which we confirm during the assessment.
Who sets the tenant priority and the outage limit, and who pays if headroom is short?
The centre does, with its electrical engineer: you decide the EV limit for the parking area and the backup-power limit, and Getz Network enforces them and logs every limit sent to a charger with its acknowledgement. If the headroom is not enough for the bays you want, the assessment says so; whether to fund an upgrade remains the owner’s decision.
Can the owner see revenue from the bays?
The owner’s portal shows operations and energy, not prices. Revenue reporting comes from the operator’s charge records and accounting exports, which you can share with the owner.
Plan charging for your centre
Start with a site assessment of your supply, backup system and parking.