Grid-headroom management
Add chargers using the capacity you already have
A building rarely uses its full connection all day. Getz Network measures the building’s load and gives EV charging what is left, so you can often install more chargers than a fixed allocation would allow. A site assessment shows whether that headroom is enough, or whether an upgrade is still needed.
An 80 kW site limit, shared live between the cars charging now.
- What you see: the site limit, what is allocated and why each EVSE gets its share
- Why it matters: EV charging stays inside the site limit you set
What it does
Using headroom safely
A connection upgrade has to be applied for at your point of supply, from Eskom or the municipality, and is sized for the peak you might draw; confirm its cost and timing for your site with them. With charging that steps back when the building is busy, the peak you need to plan for is the one you already have. Whether that is enough depends on the site, which is what the assessment measures.
Measured, not guessed
Building load comes from a designated site meter reporting over OCPP. The EV budget is the grid limit minus that load.
Your own ceiling
A site limit you configure caps EV charging even when the building is quiet, for example to respect a lease or a tenant agreement.
Peak-hour bands
Time-of-use windows can carry their own EV cap, so charging steps back when electricity is most expensive.
Shared across sessions
The budget is shared across the EVSEs with active sessions, and charging profiles go to each charger.
Interactive: grid capacity
See how the EV budget is set
Move the sliders to change the grid connection, the building’s load, your EV site limit and the time-of-use band. The chargers get the lowest of the three limits, shared across the cars that are charging.
EV charging budget100 kWSet by: Grid headroom
6 cars want up to 132 kW together. Each gets about 16.7 kW while the limit applies.
Questions
Grid-headroom management: questions
What happens if the site meter stops reporting?
Charging falls back to the site limit and time-of-use bands you configure, which apply with or without the meter, until the meter reports again.
What do you need from us for a capacity assessment?
Whatever you have of: the supply rating and point of supply, a load profile or interval readings that show the building’s peaks, the meter or gateway that could report the building’s load, the chargers you plan and their power, and any limits set by leases or tenants. Estimates are fine to start; the assessment states its assumptions and whether a connection upgrade would still be needed. Request an assessment.
How much will we save compared with a grid upgrade?
Savings depend entirely on your connection, building load profile and charger plans. A site assessment looks at your actual load and tells you how many chargers the existing headroom can support under the rules you choose. There is no promise that an upgrade can be avoided.
See what your connection can support
Share your connection size and building load, and we will look at the headroom with you.