For property owners and installation partners
EV charging that stays inside your building’s supply
Chargers draw on the same connection as your tenants, lifts and cold rooms, and on the same inverter or generator during Eskom outages. Getz CPMS keeps EV charging inside the limits you set, and you choose who runs it: you, your installer or a charging operator.
The load-control loop, live: budget, allocation per session and the limits sent to chargers.
- What you see: EV budget, load now and each session’s allocated power
- Why it matters: every limit sent to a charger is logged and acknowledged
Who does what on a charging site
The property owner is often not the party that runs the chargers. This is how the work usually divides; the actual split is agreed per site.
| Capability | Property owner | Installer or contractor | Whoever runs the chargers |
|---|---|---|---|
| Decides the site’s power and backup limits | Yes | Advises | Configures them |
| Installs and commissions the chargers | No | Yes | Signs off |
| Contracts Getz CPMS and sets prices | If self-operating | If offered as a service | Yes |
| Fixes faults and runs maintenance | No | Maintenance role | Yes |
| Sees usage and availability for the site | Read-only portal | Invited sites only | Yes |
A plan for outages, set before the first car plugs in
The continuity policy says what EV charging may take from backup power: a kW limit, a battery reserve and which sessions slow down first. Your installer sets it at commissioning from the backup system they designed, and it applies to every outage on record.
- Charging within configured backup-power limits during outages
When the grid goes down, charging drops to what the backup can carry.
- What you see: the outage rule, the 30 kW backup limit and the battery reserve
- Why it matters: during an outage, charging is capped at the backup-power limit you configure
For installers: commission it properly, support it remotely
You already install the solar, inverters and backup power these sites depend on. Getz CPMS gives you the tools to hand over a charging site that stays inside that design.
Nothing goes public half-installed
Chargers stay unpublished until your commissioning checklist is signed off, with an audited trail the owner or funder can ask for.
Your role, without the client’s money
Installer and maintenance roles see only the sites they are invited to, never prices or customers.
Fix it without the drive
Remote reset, unlock and availability changes, signed firmware campaigns and alerts that can open work orders.
Offer charging as a managed service
Run client sites from your own account, each client’s data kept apart. Terms are agreed per partner.
Share homeowners’ chargers on their schedule
Home chargers you install can serve other drivers during the weekly windows the owner sets and stay private the rest of the time, with monthly host statements.
No CPO identity? Getz Community Charging
Register and commission homes and onboard hosts under a Getz-run operator, earn a commission per commissioned connector for a fixed term, and move to your own CPO identity later.
Revenue assurance
Charging revenue checked before month-end, whoever runs the chargers
Every session at your site is priced by one tariff engine, in rand with 15% VAT for the session date, and gets one charge record that is never changed. Revenue-assurance checks flag exceptions and the value at risk before month-end, for you if you run the chargers or for the operator you work with.
Charge records with amounts reach owners and funders as exports the operator’s finance team shares; the read-only portal shows operations and energy, never prices.
- Revenue-assurance checks on every record
Revenue assurance: exceptions found in sessions and CDRs, with their root causes.
- What you see: open exceptions by age and root cause
- Why it matters: leakage is found by rules, not by month-end reconciliation
See your own sites, without running them
Whoever operates the chargers can invite you to a read-only portal: chargers online, energy delivered and sessions per day for your sites. No prices, nothing you can change, and access you can let expire or revoke.
- A read-only portal per site, included for invited owners and funders
The host and investor portal: a site owner sees their site’s operational data, never the operator’s finances.
- What you see: exactly what the host sees (the operator’s preview of the grant)
- Why it matters: property owners get transparency without your margins
Questions
Questions property owners and installers ask
Do we, as the property owner, have to contract Getz CPMS?
Not necessarily. Getz CPMS is contracted by whoever runs the chargers day to day. That can be you, your installer or electrical contractor, or a charging operator you work with. If you are not sure yet, say so when you get in touch: we explain the options, and you can still see your own sites through the read-only portal whoever operates them.
Will we avoid a grid upgrade?
We cannot say before we know the site. Getz CPMS keeps EV charging inside the budget you set from the site limit, the time-of-use band and the headroom left after the building. A site assessment compares that with how many chargers you want, and tells you plainly if an upgrade is still needed.
What happens to charging during Eskom load-shedding?
For outages on record, Getz CPMS caps the site’s EV charging at the backup-power limit you configure, so cars keep charging at a lower rate instead of stopping, and the building keeps the backup capacity it needs. Outage windows are entered by your team or created from work orders; automatic schedule import is coming soon. How chargers behave in a cut that is not on record depends on the backup system and the settings agreed at commissioning.
We already have chargers. Will they work?
Chargers that speak OCPP 1.6J or 2.0.1 can connect, whatever the vendor; what each model supports is checked at commissioning, and chargers already in service keep working as legacy chargers meanwhile. Send us the makes and models for a free charger compatibility check.
Tell us about the site
Discuss your site: a member of the Getz CPMS team replies by e-mail, and if charging looks like a fit the next step is a site assessment with you or your installer. Already have chargers? Check charger compatibility for free.